PLANT SOLUTIONS
EFB Processing Solutions
Coordinate EFB pressing with preparation, liquor handling and pressed-fibre discharge.
Process objective
Review the press alongside EFB preparation, recovered-liquor collection and fibre discharge.
Suitable feedstock
Wet EFB; describe preparation, incoming condition and intended pressed-fibre use.
Example process flow
- 01Feed preparation
- 02EFB pressing
- 03Liquor collection
- 04Fibre handling
Generic process explanation. Sequence and equipment must be agreed for the project; this is not a completed installation.
Equipment & scope of supply
| Work package | Scope to agree |
|---|---|
| Core machinery | Selected press and process equipment — Subject to KCP confirmation |
| Handling and filtration | Feed, discharge, screening and filtration interfaces; items by others identified |
| Controls and utilities | Automation, instruments and utility requirements — Subject to KCP confirmation |
| Site work and handover | Installation, commissioning and operator guidance — Subject to KCP confirmation |
| Civil and electrical works | Responsibility, exclusions and subcontract scope must be agreed |
Optional configurations
Feed preparation, liquor handling and downstream fibre processing are options for discussion.
Subject to KCP confirmation — Equipment availability, detailed layout, utilities, controls and integration responsibilities.
Installation, maintenance & spare parts
Include access, component removal, commissioning records and initial spares in the scope discussion. Confirm whether KCP will provide a site visit, remote review or separately quoted service.
Questions before you enquire
Is this a completed KCP project?
No. The process shown is an example explanation of equipment interfaces. It is not a completed-project reference or a certified plant layout.
Can the supply be turnkey or semi-turnkey?
These terms depend on the agreed responsibilities. Subject to KCP confirmation for engineering, civil works, utilities, installation, commissioning and training before a turnkey claim is made.
What should I send for an upgrade?
Provide the existing equipment list, process flow, site layout, operating duty and the constraint you want to address. Identify equipment to retain and interfaces that can change.